Before anyone designs or prices a BDA system, you need to know where your building’s radio coverage actually stands. Our signal strength survey measures public safety signal on every floor, stairwell, and garage level and gives you a written report showing exactly where coverage passes and where it fails.

GridTesting Every Floor
WrittenCoverage Report
NICETCertified Technicians

What the Survey Includes

A survey gives you real numbers to make decisions with. Here’s what’s included.

Donor Signal Measurement

We measure the incoming public safety signal on the roof to find the best donor antenna location and confirm there’s a usable signal to amplify.

  • Rooftop signal readings
  • Best donor location
  • Signal quality check
  • Interference screening

Floor-by-Floor Grid Testing

Readings are taken on a grid across every floor, stairwell, elevator lobby, and garage level, including the critical areas that require stronger coverage.

  • Grid readings on every floor
  • Stairwells and elevator lobbies
  • Garage and below-grade levels
  • Critical areas like the fire command room

Coverage Report

You receive a written report showing measured signal levels and which areas pass or fail, organized floor by floor so it’s easy to understand.

  • Pass and fail results by floor
  • Measured signal levels
  • Problem areas identified
  • Plain-language summary

System Recommendation

If coverage falls short, we explain what kind of BDA system the building needs, along with a preliminary scope and budget pricing.

  • Whether a system is needed
  • Preliminary scope
  • Budget pricing
  • Next steps with the AHJ

Existing System Evaluation

For buildings that already have a system, the survey shows whether coverage still holds up and whether the system is ready for its annual recertification.

  • Coverage with the BDA running
  • Failed zones after renovations
  • Equipment condition
  • Recertification readiness

Construction-Phase Surveys

On new construction projects, surveying at the right stage helps plan equipment rooms and cable pathways and avoids surprises before occupancy.

  • Surveys at the right build stage
  • Equipment room and pathway planning
  • Pre-acceptance testing
  • Fewer surprises at occupancy

Got a letter saying your building needs radio coverage? Start with a survey so you know what you’re dealing with.

Why Start With a Signal Survey

Skipping the survey is how buildings end up overpaying or failing acceptance testing.

01

Not Every Building Needs a System

Some buildings already meet minimum coverage. A survey can confirm that and save you from installing equipment you don’t need.

02

Quotes Without Data Are Guesses

A BDA price that isn’t based on measured signal is an estimate at best. Survey data lets you compare proposals on real numbers.

03

Problem Areas Aren’t Obvious

Coverage can be strong on upper floors and gone in stairwells, cores, and garages. Only floor-by-floor testing shows where the gaps are.

04

Donor Signal Can Be the Limit

If the signal reaching the roof is weak or noisy, the design has to account for it. Measuring first prevents a system that can’t perform.

05

Renovations Change Coverage

New walls, glass, and tenant buildouts can create dead zones in a building that passed before.

06

Boards and Owners Need Documentation

A written report gives condo boards, owners, and managers something concrete to review, budget for, and share with the fire department.

Need numbers for a board meeting or budget? Schedule a survey and get a written report.

BDA Surveys Across South Florida

We perform signal strength surveys throughout Miami-Dade, Broward, and Palm Beach counties. Find your city below.

Don’t see your city? We serve all of South Florida. See our county pages for Miami-Dade, Broward, and Palm Beach.

How a Signal Survey Works

Most surveys are completed in a single visit, with the report delivered shortly after.

Step 01

Schedule & Access

We confirm access to the roof, stairwells, garages, and mechanical spaces and schedule around your operations.

Step 02

Donor Readings

We measure the public safety signal at the roof and identify the best donor antenna location.

Step 03

Grid Testing

We walk every floor, stairwell, and garage level, taking readings on a grid.

Step 04

Report & Recommendation

You receive a written coverage report and, if needed, a recommended scope and budget pricing.

Why Buildings Start With Universal

We give you real data and a straight answer, not a sales pitch for equipment you may not need.

Honest Recommendations

If your building already meets the coverage requirement, we tell you so and give you the report to prove it.

Fire Alarm and Radio Under One Roof

We install the BDA and make the fire alarm supervisory connection ourselves, so there’s no finger-pointing between two contractors at acceptance testing.

NICET-Certified Technicians

Our technicians hold NICET certification in fire alarm systems, which matters because BDA supervision is inspected as part of fire alarm compliance.

Licensed Florida Contractor

We hold Florida licenses EC-13010477 and EF-20001077 and use FCC-registered public safety signal boosters on every installation.

Recertification Tracked for You

Clients on our annual program get scheduled before their certificate expires, so the due date never sneaks up on management.

Certified, Licensed & Trusted

NICET
NICET CertifiedNational Institute for Certification in Engineering Technologies
FASA
FASA CertifiedFlorida Automatic Fire Alarm Association certified contractor
BASA
BASA CertifiedBurglar & Fire Alarm Association, licensed Florida alarm contractor
ETL
ETL Partner #EF20001077Licensed ETL Partner for fire alarm installation and service

BDA and ERRCS Questions

What owners, managers, and boards ask us most about signal strength surveys.

It’s a set of measurements of the public safety radio signal at your building’s roof and throughout the interior. The results show whether the building meets minimum in-building coverage and where it falls short.

Most buildings can be surveyed in a single visit. Large towers and campuses may take longer, depending on the number of floors and garage levels.

Yes. If coverage meets the requirement, you may not need a system. If it falls short, the report shows where and we recommend a scope.

Yes. A survey of an existing system shows whether coverage still holds up and highlights problems before recertification.

Yes. The report documents the readings and results in a format you can share with the fire department, your board, or your engineer.

Every floor, stairwell, elevator lobby, and garage level, along with critical areas such as the fire command room.

Schedule Your Signal Strength Survey.

Tell us about your building, its size, and whether you’ve received a notice from the fire department. We’ll get your survey scheduled.

  • Grid testing on every floor
  • Written coverage report
  • Honest system recommendation
  • Serving Miami-Dade, Broward and Palm Beach

Send Us a Message