BDA for New Construction

BDA Systems for New Construction
Without Delaying Occupancy.

Many new buildings must pass an in-building radio coverage test before the certificate of occupancy is issued. We work with general contractors and developers to survey, design, permit, install, and test BDA and ERRCS systems on the construction schedule, so radio coverage never holds up opening day.

COReady Coverage
GCCoordinated Schedules
NICETCertified Technicians

BDA Services for New Construction

Radio coverage is easiest and cheapest when it’s planned with the building. Here’s what we handle.

Early Coverage Planning

We check the donor signal early in design and, once the structure is up, run a signal strength survey to confirm what the building will need.

  • Donor signal check during design
  • Equipment room planning
  • Riser and pathway planning
  • Budget for the BDA scope

BDA Design & Permitting

We design the BDA system, prepare permit drawings, coordinate with the radio system operator, and respond to review comments.

  • System design
  • Permit drawings
  • Radio system operator coordination
  • Response to review comments

Installation on Your Schedule

Cable is roughed in before ceilings close and antennas are installed at trim-out, coordinated with the electrical contractor and other trades.

  • Cable rough-in before ceilings close
  • Antenna installation at trim-out
  • Equipment room buildout
  • Coordination with other trades

Fire Alarm Integration

We design and wire the supervisory connections between the BDA and the fire alarm panel so acceptance testing covers both systems together.

  • Supervisory interface design
  • Panel programming
  • Combined acceptance testing
  • One contractor for both systems

Backup Power

We size backup power for the required runtime and install it with the rest of the system, ready for testing at turnover.

  • Battery sizing for required runtime
  • Enclosure and charger installation
  • Load testing before turnover
  • Documentation for the AHJ

Acceptance Testing

We pre-test coverage before the official test, lead acceptance testing with the fire department, and set the owner up for annual recertification after turnover.

  • Pre-acceptance coverage testing
  • AHJ acceptance test
  • Certificate of compliance
  • Owner set up for recertification

General contractor on a new project? Bring us in during design to avoid CO delays.

What Delays Radio Coverage on New Projects

These are the problems that hold up certificates of occupancy, and how we avoid them.

01

Coverage Addressed Too Late

When radio coverage isn’t considered until final inspections, there’s no time to design, permit, and install a system without delaying occupancy.

02

No Equipment Room or Pathways

BDA equipment needs space, power, and protected pathways. Fitting them into a finished building costs more and takes longer.

03

Ceilings Closed Before Rough-In

If cable isn’t run before ceilings and walls close, installation means cutting into finished surfaces.

04

Radio Operator Coordination

Public safety signal boosters require coordination with the radio system operator, which takes time and can’t be rushed at the end.

05

Separate Fire Alarm and BDA Contractors

When the BDA and fire alarm are handled by different companies, the supervisory connection often falls through the cracks at acceptance testing.

06

Failing the First Coverage Test

Without a pre-test, problems show up during the official acceptance test, which then has to be rescheduled.

New Construction BDA Across South Florida

We work with general contractors and developers throughout Miami-Dade, Broward, and Palm Beach counties. Find your city below.

Don’t see your city? We serve all of South Florida. See our county pages for Miami-Dade, Broward, and Palm Beach.

How We Work With Your Construction Team

BDA work runs alongside your schedule from design to turnover.

Step 01

Design Phase

We review drawings, check the donor signal, and plan equipment space and pathways.

Step 02

Permitting

We prepare BDA permit drawings and coordinate with the radio system operator and the AHJ.

Step 03

Rough-In & Install

We run cable before ceilings close and install antennas and equipment at trim-out.

Step 04

Test & Turnover

We pre-test, lead acceptance testing, and hand over the certificate and documentation.

Why Contractors Use Universal for BDA

One contractor for the BDA and the fire alarm means one schedule, one test, and no gaps between trades.

Built Around the Construction Schedule

We plan BDA work in phases that match your project and coordinate directly with your superintendent and trades.

Fire Alarm and Radio Under One Roof

We install the BDA and make the fire alarm supervisory connection ourselves, so there’s no finger-pointing between two contractors at acceptance testing.

NICET-Certified Technicians

Our technicians hold NICET certification in fire alarm systems, which matters because BDA supervision is inspected as part of fire alarm compliance.

Licensed Florida Contractor

We hold Florida licenses EC-13010477 and EF-20001077 and use FCC-registered public safety signal boosters on every installation.

Recertification Tracked for You

Clients on our annual program get scheduled before their certificate expires, so the due date never sneaks up on management.

Certified, Licensed & Trusted

NICET
NICET CertifiedNational Institute for Certification in Engineering Technologies
FASA
FASA CertifiedFlorida Automatic Fire Alarm Association certified contractor
BASA
BASA CertifiedBurglar & Fire Alarm Association, licensed Florida alarm contractor
ETL
ETL Partner #EF20001077Licensed ETL Partner for fire alarm installation and service

BDA and ERRCS Questions

What general contractors and developers ask us most about BDA systems on new projects.

As early as possible, ideally during design. That allows time for equipment space, pathways, permitting, and radio system coordination.

You can, but if the building fails, you’ll be designing and installing a system while waiting on your certificate of occupancy. Planning early avoids that risk.

Yes. We coordinate pathways, power, and timing with the electrical contractor and the rest of the trades.

Yes. Having one contractor handle both the fire alarm and the BDA makes the supervisory connection and acceptance testing simpler.

Then a survey can document that it meets the requirement, and no system may be needed. We’ll tell you if that’s the case.

BDA systems need annual testing and recertification. We can set the owner up on an annual program at turnover.

Keep Your Project On Schedule.

Tell us about your project, its size, and where it is in construction. We’ll recommend the right time to survey and give you a clear BDA scope.

  • Early coverage planning
  • Design, permitting and installation
  • Fire alarm integration and acceptance testing
  • Serving Miami-Dade, Broward and Palm Beach

Send Us a Message